will be a nice little booster if ytl can announce that their green data centre park can cater additional capacity with "layout optimisation" option to increase 50MW or more.....
The land in Kulai that YTL Power bought 2 years ago is large enough for lots of data centre buildings, but large enough for about 500MW solar power farm.
If not all the data centres there require green power, YTL Power could reduce the size of the solar power farm slightly, and it would have more room to build a lot more data centres like another 500MW if there is demand.
will be a nice little booster if ytl can announce that their green data centre park can cater additional capacity with "layout optimisation" option to increase 50MW or more.....
The land in Kulai that YTL Power bought 2 years ago is large enough for lots of data centre buildings, but large enough for about 500MW solar power farm.
If not all the data centres there require green power, YTL Power could reduce the size of the solar power farm slightly, and it would have more room to build a lot more data centres like another 500MW if there is demand.
完全认同。如果太阳能发电需求不高,那片土地可以建好多座数据中心。